fbpx
Start / Projects / Public pools / Irlanda del Norte

Irlanda del Norte

Irlanda del Norte

This is the Infinity Swim Academy indoor pool in Newry, Northern Ireland.
The crowning system chosen for this infinity pool has been the Wiesbaden system. This system consists of two multipurpose pieces. The ready-to-install porcelain gutter piece with enamel in a variety of colors facilitates execution, reducing assembly time. The channel is made and ready to install, but it has to be complemented with the special piece that is glued to the channel with the function of creating the 'overflow' Wiesbaden.
In this case, a 2.5 cm high plastic grid has been used, creating an overflow system with a step. On the other hand, if a 3.5 cm high grid had been used, the system would have been overflowing "on edge."
This pool crowning system is an integral ceramic solution thanks to our grille made of white porcelain paste. In addition, our ceramic grill presents an ideal solution for round or curved pools.
The pool glass has been covered with 24.5 × 49.5 cm bases in blue, along with others in steel that have been used to mark the streets and others in cobalt to mark the depth.
KlinkerTech products are designed to cover all the needs that may arise when designing a pool. We have special parts and edges always adapted to quality requirements.

Category
Date:
Tags: